The goal of the first week
It is not to “get the thing built”; it is to settle four things:
- What problem this round solves, and what it does not
- Which materials are needed, who provides them and when
- Who decides, who cooperates and how to contact them
- What the first delivery is, and when it will be reviewed
Once these four are settled, rework becomes much less likely.
Kickoff checklist
Client / project:
Problem to solve (one sentence):
Out of scope this round:
Materials: item / provider / due date
Decision maker / day-to-day contact / contact details:
First delivery: content / date
Acceptance standard: what counts as done
Send it to the client to confirm; that is more reliable than saying it verbally.
Collecting materials
Only collect what this round needs:
- Existing practice: samples in sheets, documents and chat logs
- Brand material: name, logo, common wording
- Content material: introduction, prices, frequently asked questions
- Accounts and permissions: who needs to grant them, and to what extent
Organise them the same day they arrive, and mark what is missing or unclear.
The first delivery
In the first week, give them a “small, visible thing”:
- A one-page scope note (what will and will not be done)
- A page draft or field list
- A list of material gaps
It serves two purposes: confirming the direction and exposing disagreements. The earlier they see something real, the earlier you learn where you misunderstood.
Communication rhythm
- Use one fixed channel; do not scatter messages across several groups
- After each conversation, send a short record: what was decided, what still needs confirming and who does what next
- Record changes separately: who asked, what it affects and how the schedule shifts
Checks before the second week starts
- The client has confirmed the scope note
- The material gap list has been sent, with clear due dates
- The first delivery has been reviewed and feedback received
- The decision maker and day-to-day contact are clear
- A way to record changes has been agreed
To start a new project on firmer ground, bring the client and materials to a free 15-minute call and run through the first-week checklist first.
Questions
What if the client cannot explain the requirements?
Collect their existing material first: how they do it now, the sheets they use, documents they have sent. Working back from the material is more effective than holding more meetings.
Should I deliver something in the first week?
You can deliver something very small: a one-page scope note, a page draft, a field list. The goal is to have the client confirm the direction, not to finish everything.
What if the materials cannot all be collected?
List what is missing, who provides it and when it is needed, send it back, and explain what will be delayed. Do not wait for everything before starting; begin with the parts that do not depend on it.