Four closeout tasks
- Acceptance: check item by item against the standard set before work started
- Delivery: the finished product, documents, account and data lists
- Handover: who maintains it, how to change it, who to ask
- Follow-up: one week, one month, quarterly
Only when these four are done is the project truly finished.
How to run acceptance
- Use the standard from before work started; do not change it at the last minute
- Tick items one by one; mark anything not applicable as “not applicable” with a reason
- Record problems on the spot and agree a fix date
- After both sides confirm, add a line “accepted” to the record
Verbal acceptance tends to be repeated; writing it down is the easiest path.
Delivery checklist
- The live address or installation package opens and works
- Change instructions: where to edit copy, replace images and change prices
- Data and account list: where the data is and who holds the accounts
- Backup location and recovery method
- Common questions and contact details
- Items not included this round
Handover points
- Who handles daily maintenance and who handles technical issues
- Response time and maintenance scope
- How changes are requested and billed
- One training session: in person or screen-recorded, with the client operating it once themselves
Handover succeeds only when the other side can change one piece of content independently.
Follow-up arrangements
- One week after delivery: confirm it works and nothing is stuck
- One month: ask about usage frequency and new needs
- Quarterly: send an update or something useful
Put follow-up records in the client table and look at them together with payments and renewals.
Three closeout pitfalls
- No acceptance criteria agreed, so everyone says something different at closeout
- Only the product delivered, not the documentation, so every small change later comes to you
- Accounts still in your hands, so the client has no control
Checklist
- Acceptance criteria match those set before work started and are checked item by item
- All four delivery items are present
- Account and data ownership have been handed over
- One training session has been done
- Follow-up dates are in the calendar
- Items not included this round are written down
To make project closeout easier, bring the current project to a free 15-minute call and run through the acceptance and delivery checklists first.
Questions
When should the acceptance criteria be set?
Before work starts, written into the task brief or the proposal; at closeout, check item by item against the same standard and do not add requirements at the last minute.
What should the deliverables include?
The accessible finished product, instructions for making changes, a data and account list, and common questions plus contact details; all four are needed before delivery counts as complete.
Should I follow up after closeout?
Yes. Confirm usability one week after delivery, ask about usage one month later, then follow up quarterly; fix problems found along the way promptly.