Start with a scope list
Before work starts, write two columns:
- Doing this round: checkable, specific deliverables
- Not doing this round: what is explicitly excluded
The more specific the list, the easier everything later. “Build a company site” is not a scope; “home page + services page + contact form, three pages in total” is.
The four change steps
- Record: what the client said and when
- Assess: the impact on features, timing and cost
- Quote: the additional work, the schedule adjustment and the cost
- Confirm: only start after a written confirmation
If any step is missing, it easily becomes “I thought you agreed” later.
Change template
Change: <what to add / change>
Impact: features <...>; timing <delayed by how many days>; cost <how much more>
Alternative: <do without it, or replace with an existing feature>
Confirmation: starts after replying "confirmed"
Three reply scripts
- “This can be done. Let me record it first and reply after assessing the timing and cost.”
- “This is not in the current scope; it is an addition. I can give you two options: include it, or put it in the next round.”
- “If the deadline cannot move, we can use the existing feature for now and add this in the next round.”
The core is: do not reject the requirement, but turn “adding” into a choice with a cost.
What counts as a change
- New pages, features or fields
- Changing a confirmed process or rule
- Replacing materials in a way that causes rework
- Delivering earlier or compressing the schedule
Not changes: fixing errors, completing content as originally agreed.
Preventing scope creep
- State “what is not solved this round” in the proposal
- Send a one-page confirmation note after every conversation
- Sync progress and scope status once a week
- Collect change records and review them together at closeout
Checklist
- A written scope list exists (do / do not)
- Every change has record, assessment, quote and confirmation
- Changes and costs are written into the terms or confirmation note
- Small changes that do not affect timing are combined and recorded
- Scope status is synced weekly
- Closeout accepts against the scope list
To keep the project from being dragged down by “just adding a little”, bring the current project to a free 15-minute call and write the scope list first.
Questions
Should I agree immediately when a client adds a requirement?
Agree to 'record it first' rather than committing to a time on the spot; reply after assessing the impact, which neither damages the relationship nor loses control.
Do small changes also need a change request?
If they affect timing or cost, yes. Small changes that do not can be combined into the next round, but still record them so they do not accumulate into invisible work.
What if the client says 'this should have been included'?
Go back to the original scope list and check item by item; if it is not on the list, it is new and handled as a change; if it is on the list, fix it for free.